Playground Case Studies

If you are looking for playground equipment for schools, then this page is full of playground case studies. Take inspiration from hundreds of different projects showcasing a range of inspiring designs.

Broadoak Primary School, Manchester

Broadoak Primary School was originally two separate schools. The Junior school opened in June 1970 and the Infant school in April 1972. Their aim is to provide all children with meaningful and engaging learning experiences that will prepare them for life in the 21st century.
EXPLORE MORE

Little Gaddesden CofE Primary School, Berkhamsted

Little Gaddesden CofE Primary School is a small rural primary school. They were looking to update their tired playground equipment and develop new areas of interest for the children. As they are in a rural setting, any equipment needed to be sympathetic to their environment and surroundings.
EXPLORE MORE

Shoreham Village School, Sevenoaks

The schools existing EYFS area was dull and unorganised with lots of none fixed resources. They had a 30k budget which had a cut-off date to be spent. The area was quite small and lacked structure.
EXPLORE MORE

Sunnyside Spencer Academy , Nottingham

Sunnyside Spencer Academy is another school in the Spencer Academy Trust. The school had an existing field that was often utilised for forest school activities but they wanted to enhance this and create a more functional space.
EXPLORE MORE

Barlby Primary School, London

Barlby Primary School wanted an all weather sports pitch installed onto their existing concrete MUGA. The school is an outstanding, happy place where all of the children and adults aim to succeed.
EXPLORE MORE

Stoke Prior First Primary School , Bromsgrove

Stoke Prior First School approached ESP to redesign an area of their existing playground that was out of use due to safety reasons. They wanted a calming and reflective zone that could be used for learning as well as a breaktime space outside of the classroom.
EXPLORE MORE

The Syston Day Nursery, Leicestershire

The nursery engaged with ESP to discuss enduring surface solutions which would be suitable for toddlers and withstand the rigours of daily use of up to 60 children. The client also required a structure that would enhance on site provision for physical development.
EXPLORE MORE

Letchmore Infant School, Stevenage

The school were looking to replace their existing equipment located on the school field with a range of trim trail items that would encourage upper body development for the reception children age 4/5.
EXPLORE MORE

St Peter’s London Dock’s CE, London

St Peter’s London Dock’s CE Primary School is a small, friendly, church school, steeped in the rich history of Wapping and the London Docks area. It is a school whose foundations over 150 years ago continues to inspire its ethos and values today
EXPLORE MORE

Foundry College, Wokingham

The school wanted to add physical activity equipment to an area that had artificial grass that was failing. The equipment need to be suitable for ages 7-11.
EXPLORE MORE

An Outstanding New Playground in Sheffield at Ballifield Primary

ESP PLAY completed this stunning EYFS outdoor play area at Ballifield Primary School. Ballifield Primary School is in Sheffield and is part of the Crucible Co-operative Learning Trust. Everyone at this school and in their local community live their motto of ‘A Family of Learning’ by closely supporting each other and working collaboratively to support their pupils to become respectful, confident and life-long learners. Parents, Governors, pupils, and staff work together in close partnership to improve all aspects of school life.
EXPLORE MORE

A New Playground in Newcastle at The Alan Shearer Centre

Take a look at this stunning new playground in Newcastle at the Alan Shearer Centre. The Alan Shearer Centre is a highly specialist, respite, residential and social facility for people with complex disabilities and acute sensory impairments. Situated in its own grounds on the outskirts of Newcastle, the Alan Shearer Centre comprises three specialist facilities. This new playground is the latest addition made to the centre which will enable children and families from the community to access outstanding playground facilities. ESP PLAY worked closely with the centre to create an inclusive playground for children aged from 2 to 18 years old.
EXPLORE MORE

Coton in the Elms Primary School, Derbyshire

The school are delighted with their installation and the manner in which the works have been carried out. From contact through to completion, the process has been straightforward and communication has been very thorough throughout the design and build process. Ed took on board our requirements, underrstood the site limitations and specified a solution that best meets the needs of the children for our budget.
EXPLORE MORE

Cowbit St Mary’s Primary School, Lincolnshire

Cowbit St Mary’s Primary School based in Spalding in the county of Lincolnshire contacted ESP Play after we completed their first project early in 2023. The school was so impressed by the sales, right through to the installation and wanted to create more engaging areas for the children to use all year round.
EXPLORE MORE

Get in Touch with our Team

Fill in the form below and we will get back to you.