Playground Case Studies

If you are looking for playground equipment for schools, then this page is full of playground case studies. Take inspiration from hundreds of different projects showcasing a range of inspiring designs.

Rodings Primary School , Essex

A solution to turning a grass area that gets muddy in wet weather into a year round useable space. The playground surfacing selected for this development enables the school to provide a high-quality outdoor provision whatever the weather.
EXPLORE MORE

All Hallows School, Shepton Mallet, Somerset

A fresh new look for the Nursery and Reception playgrounds at All Hallows School. A perfect example of how to maximise on limited space. All Hallows School is a non-selective co-educational prep school that provides day and boarding facilities. The school is located a mile east of Cranmore village, near the town of Frome, Somerset, in the West of England.
EXPLORE MORE

Imperial Avenue Primary School, Leicestershire

A wonderful transformation of a quad area that can now be used all year round. The natural feel of the space provides a calm and peaceful area. A wonderful transformation of a quad area that can now be used all year round. The natural feel of the space provides a calm and peaceful area.
EXPLORE MORE

The Mall School

This amazing playground surfacing project completed at The Mall School in Twickenham showcases how resin bonded gravel can transform dull tarmac spaces.
EXPLORE MORE

Queenswell Infant & Nursery School- Barnet- London

A new climbing area including a bespoke pirate ship and clamber stack installed in the infant playground. The project also included the EYFS playground where the school now have balance beam on mounds, a tunnel and a bridge for the little explorers.
EXPLORE MORE

Belvue School at Ken Acock – Northolt, West London

The school were looking to add an assault course, roundabout, trampoline and a play cabin to the year 7 site. This site was supposed to be temporary which was why this was not developed however, as this became permanent they wanted to provide a much-needed area for physical development for the children.
EXPLORE MORE

Basildon C.E. Primary School in Reading, West Berkshire

The Head Teacher Melissa contacted ESP PLAY as they had an overgrown nature area that needed converting for forest school activities. Due to the time of year and commitments at the school a meeting was booked for the New Year where our consultant was able to view the space. Melissa wasn’t joking when she advised it was overgrown, but we were confident we could transform the space.
EXPLORE MORE

Clarendon Primary, Bolton

The climbing equipment in the Early Years area at Clarendon Primary was beyond repair, the school had maintained the equipment for as long as they could but understood it now needed to be removed following the latest inspection report that had condemned it.
EXPLORE MORE

Heybrook Primary, Rochdale

Having already worked with the school in creating an outstanding new early years outdoor provision for them, Headteacher Toni got in touch with her focus now on the main playground.
EXPLORE MORE

Woodlands Academy, Aspley, Nottingham

Woodlands Academy caters for pupils aged 3 -16yrs with a wide variety of special educational needs, including speech, language and communication needs, moderate to severe learning difficulties and profound and multiple learning needs.
EXPLORE MORE

Nethergate Academy, Nottingham

This recently completed special educational needs outdoor area at Nethergate Academy has been completely revamped. Fourteen trees were felled, and shrubbery was replanted wherever possible. Fences were taken down and reinstalled to expand the playground area. The flagship tower unit now offers boundless entertainment and play opportunities for the students. Other new play elements include swing sets and in-ground trampolines. The entire area was covered with artificial grass, preserving the asphalt path for foot traffic.
EXPLORE MORE

Rakegate Primary School, Wolverhampton

This new climbing frame at Rakegate Primary School is a hit with the children! The equipment the school had was a freestanding balance trail that wasn’t suitable or challenging enough for the children. Adding our Fawcett Playtower to the space has not only made the children happy it also offers the challenge that was missing.
EXPLORE MORE

Woodlands Park Nursery School and Children’s Centre, Tottenham, London

The Site Manager contacted ESP PLAY in 2022 following works we had completed for him at his previous school. The much-loved existing climbing frame required replacement. He was hovering between 2 options, a like for like replacement or something different which worked the same muscle groups. We created 2 options for the school but unfortunately the project was put on hold due to finances.
EXPLORE MORE

Cloverlea Primary, Altrincham

Stuart, a member of the PTA at Cloverlea Primary School in Altrincham, contacted three companies to gather some ideas and costs for a new clamber stack style climbing equipment. The PTA had been working hard to fund raise to remove and replace the old climbing equipment. The new equipment looks amazing and the children love it!
EXPLORE MORE

Ravenbank Community Primary School, Lymm, Cheshire

Courtney contacted ESP Play with a request for a free playground design. She wanted to take full advantage of the free service that we offer by booking an appointment with our area sales representative to get some expert advice and ideas on how they could enhance their early years outdoor provision.
EXPLORE MORE

Get in Touch with our Team

Fill in the form below and we will get back to you.